Skip to main content

Download

Title Staff Time and Effort Reporting Tool
Summary For staff that work on multiple cost objectives, personnel costs must be allocated proportionally between all the different programs administered by the VR agency, and other programs staff work on within the designated State agency (DSA) even if outside the designated Staff unit (DSU) or included in the indirect cost rate or cost plan. This new tool will help you understand the regulatory requirements, VR-specific considerations, verification of time and effort, and internal controls.
Author Vocational Rehabilitation Technical Assistance Center for Quality Management (VRTAC-QM)
Publisher Vocational Rehabilitation Technical Assistance Center for Quality Management (VRTAC-QM)
Publish Date 8/16/2021
Filename Staff-Time-and-Effort Reporting-Tool-0806_ACC.pdf


Thank you for downloading these materials. Take our survey to let us know what you think of them and the NCRTM website.

The materials on NCRTM’s web site are provided "as is". NCRTM makes no warranties, expressed or implied, and hereby disclaims and negates all other warranties, including without limitation, implied warranties or conditions of merchantability, fitness for a particular purpose, or non-infringement of intellectual property or other violation of rights.